Klant worden?
  • Incl.Excl.
    BTW
  • 0

    One Pace Google Sheets | Web |

    =COUNTIF(D2:D28, "Completed") Next to it, add: Arcs Completed out of =COUNTA(A2:A28) In cell C30 (or any summary area), add:

    | A | B | C | D | E | F | G | |---|---|---|---|---|---|---| | | Episodes (Pace) | Runtime (hrs) | Status | Date Started | Date Completed | Notes | Step 2: Input the One Pace Arc List Here is the core data to copy into your sheet (based on the standard One Pace release order up to recent arcs). Fill columns A, B, and C. one pace google sheets

    Save and run once to authorize. Now any status change logs the date. 1. Episode-to-Pace Conversion Helper Create a second sheet (tab) called Episode Lookup . Column A: Original OP episodes (1–1000+). Column B: Corresponding One Pace episode/file. Use vlookup to find where you are. Now any status change logs the date

    =SUMIF(D2:D28, "Completed", C2:C28) This shows total hours watched. Change "Completed" to "Watching" to see remaining runtime. In column H (add a header Last Activity ), use this script (requires Apps Script – simple version): Column A: Original OP episodes (1–1000+)

    function onEdit(e) var range = e.range; var sheet = range.getSheet(); var col = range.getColumn(); var row = range.getRow(); if (col === 4 && row > 1) // Column D is Status sheet.getRange(row, 8).setValue(new Date()); // Column H gets today's date

    Reeds bekeken

    Vergelijk 0

    Voeg nog een product toe (max. 5)

    Start vergelijking

    Wij slaan cookies op om onze website te verbeteren. Is dat akkoord? JaNeeMeer over cookies »